IMG_0976

Brentford FC Training Facility

  The Challenge Standing water and saturated ground in-between the training pitches and outside of existing drainage system had been a long standing issue for the ground staff.  Prior to the system being installed the area treated would remain saturated with standing water remaining for days. Why use the EGRP installation system? With minimal disruption…

Drilling+Flag

The Gleneagles Hotel

  The Challenge The world famous Gleneagles golf course was experiencing standing water issues on the 16th hole of the Queens course. The fairway running towards the green runs through a valley causing flooding issues on the green. The objective was to install a drainage system, with minimal disruption, onto the Queens 16th Green, which…

Newcastle High School for Girls

Newcastle High School for Girls

  The Challenge The City of Newcastle’s storm drains were operating at capacity and could therefore not afford take any extra run off from storm water events. This was a large hurdle in the planning application of the all-weather hockey pitch proposed by the Girls Day Schools Trust (GDST) on behalf of Newcastle High School…

Install 20ft

Oak Tree House

  The Problem Oak Tree House is a newly built detached property with a large basement designed to house a cinema room, bar, gymnasium and wine cellar and which also houses the plant room for this substantial home. Although the basement was originally waterproofed, complete with a drainage system around the external perimeter, water ingress…

Fulham FC Training Ground

Fulham FC Training Facility

  Fulham FC agreed to install the EGRP system in June 2015 at their training facility in Motspur Park, New Malden. Standing water and saturated grounds in-between the training pitches and outside of existing drainage had been a long standing issue for the ground staff. Three of the poorest draining areas of the facility were…

Ascot Racecourse

Ascot Racecourse

  Ascot Racecourse Parade Ring The Challenge was to install a complete drainage system 9 days before a major event! The Clerk of the Course at Ascot gave the go ahead to begin the install on 6th October 2014 for a project scheduled to take one week. Five days later our EGRP system was fully installed, the Parade Ring cleaned and fencing reassembled….

DSC00573

Silverstone Perimeter Road

  Silverstone race circuit maintains a significant internal road network which provides access and transportation for staff, workers and members of the public. During racing events it is crucial that these roads are in good condition as service vehicles may need to access the track. One such road, adjacent to a two-meter high grass bank,…

After install

Copt Heath Golf Club

  Copt Heath Golf Club The Energy-passive Groundwater Recharge Pump (EGRP) System solves long standing problem on 1st Fairway After a successful installation in the above area in March 2014, GWD returned to site for further works in March 2015. The picture above shows the area of the 1st Fairway where, following heavy rainfall, standing…

1st XV Game 120414 Lineout

Harbury RUFC

  This community rugby club is situated on a multi-sports site and the EGRP solution has meant no disruption to either the rugby or cricket season. Indeed, rugby matches were played on the 1stXV pitch the first three weekends of our weekday installation – the picture above shows the game on the third weekend when over 80% of the…

Becketts Corner

Silverstone Becketts Corner

  Becketts Corner drainage works – pre F1 Grand Prix July 2014 Becketts Corner on the F1 Circuit at Silverstone was experiencing standing water issues in the centre of the grassy area away from the edge of the track. French-drains were dealing with surface water running-off the track, however, the central area of Becketts was…